Forward Together

Update from Bro. Greg

History of Events Building Plans

 

 

Photos from 10/29/06

Photos 10/26/05 - 10/04/06 Photos from Ground Breaking

 

 

Building Update from Bro. Greg

October 4, 2006

Compass, as we have affectionately called it, is no more. Our youth have met in this building hundreds of times for worship and fellowship. Sunday School classes met for the last time in the annex on October 1, 2006. Today, October 4th, the building has been demolished and is presently a pile of rubble. The garage that housed vans, yard sales, junk, etc. is gone.

This building has been standing a long time in Portland. Many of our folks remember when it didn’t belong to the church. They remember it as a flower shop, an automobile repair shop, and other things.

Today is evidence that we are moving ever closer to acquiring possession of our new facility. Adult Sunday School classes will meet in the new building for the first time this Sunday. New preschool, children, and youth space is on the verge of being completed. These are indeed exciting days.

Take a good long look at the view you will now have when you travel north on Hwy 109. What a great picture of First Baptist Church

Bro. Greg

<back to top of page>

Pictures from 10/29

The Gym floor is complete !!!!!!!!

 

We are finally in !!!!!!!!

 

<back to top of page>

 

Events

Tuesday, November 04, 2006

We will having some Sunday School classes in the new building this Sunday - Praise the Lord

The Nursery is being setup

The Compass building was cleaned out Sunday and Monday - Today the building came down so the parking lot can now start to be worked on.  The pile of rubble from the building will be gone by tomorrow.

Gym floor is being cleaned to the flooring can be laid with the next couple of weeks,

Gym walls are painted and have a purple strip around both floors.

 

 

Sunday, September 10, 2006

Kitchen appliances are being installed

Most of the Sunday Schools rooms on the 1st floor are complete

Choir Suite is starting to take shape - platform is being build

Platforms are being built in the Youth room

Ceiling tiles are installed on the first floor

Wall connecting the 2 buildings are knocked down

Outdoor lighting is working.

Carpeting and tiling are completed on the 1st floor

 

 

Wednesday, August 16, 2006

The walls and windows are completely installed in the racquetball count

Tiles is being laid in the hall on the first floor

AC is working and the gym is COLD

Outside trim is being completed

Carpet rolls are currently in the gym

Lights are installed and working in the staircases

Fire alarm system is installed

 

 

Wednesday, July 27, 2006

The walls are being installed in the racquetball count

Basketball nets are installed

Toilets are being installed

Light fixtures are being installed

All doors are installed

AC unit is installed

All dry-walling and painting is completed.

Tiles are being installed in the Sunday Schools rooms

 

 

Wednesday, June 6, 2006

Dry-wall finishers continue to work on the second level. 

Tile is being laid in the upstairs restrooms. 

The walking track rails are almost completely installed. 

The fire system is being wires. 

Heating and air conditioning ducts are a major project right now, and windows are being installed a few at a time. 

Electrical work has been done that will allow our existing building to stay on line while also providing power to the new building.  This will allow the elevator company to being installation.

 

Tuesday, April 4, 2006

Sheet Rock is being hung on the 1st floor

 

Thursday, March 30, 2006

Brick is being laid on the back wall

The cross walk steal is up

The inside framing is almost complete and the the 2nd floor framing is just starting

 

Thursday, March 1, 2006

Education section: Cement was poured on half of the 2nd floor

The walls for hydraulic elevator have been put up today.

The wall for the dressing room in the gym area have been started.

First set of stairs have been added on the south side of the building

 

Thursday, February 23, 2006

Education section: all of the second floor sheet metal has been laid.

The pit was dug for the hydraulic elevator today and concrete pad poured in the bottom of the hole

The walking track just needs the final corner of steel to be installed.

Steel Roof started.

 

Thursday, January 12, 2006

Demolition of the Child Care Center ("The Blue House") to make room from our expansion.

 

Friday, November 18, 2005

Steel is being erected.

 

Monday, October 26, 2005

Started foundation digging, pouring, and laying of blocks,

the building is beginning to take shape.

 

<back to top of page>

Photos

Time Elapse

 

 

 

 

Pictures from 10/04  - click on picture to enlarge them

 

 

Pictures from 10/01

 

Pictures from 09/21

 

Pictures from 09/09 - click on picture to enlarge them

 

Pictures from 08/16 - click on picture to enlarge them

 

Pictures from 07/24 - click on picture to enlarge them

 

Pictures from 06/11 - click on picture to enlarge them

 

Pictures from 06/09 - click on picture to enlarge them

 

 

Pictures from 03/30 - click on picture to enlarge them

 

Pictures from 03/18 - click on picture to enlarge them

Outside view

1st Floor

 

2nd floor

 

Pictures from 03/01 - click on picture to enlarge them

1st Floor

2nd floor

 

Pictures from 02/23 - click on picture to enlarge them

 

Pictures from 01/29 - click on picture to enlarge them

 

Pictures from 01/12 - click on picture to enlarge them

 

Pictures from 11/28 - click on picture to enlarge them

 

Pictures from 11/18 - click on picture to enlarge them

 

Pictures from 11/10 - click on picture to enlarge them

 

Pictures from 11/02 - click on picture to enlarge them

 

Pictures from 10/26 - click on picture to enlarge them

 

Ground Break Ceremony - click on picture to enlarge them

 

<back to top of page>

 

Building Plans

Click the following links below for a view of our future

These files are pdf files and require Abode Reader to launch

<click here if you don't have Abobe and would like to

download the software - its free>

1st floor plan layout

2nd floor plan layout

Outside view from Church Street

Outside view from 109 (front of the church)

Outside view from McGlothlin Street

Outside view from the rear

Overhead view of 1st Baptist's property

 

Early Years Currently